FADAL MILL
-
Dismantled machine tool units
-
Cleaned and inspected all quoted components
-
All components readied for customers inspection
-
Machine, scraped, flaked, and fit all quoted way surfaces to full bearing; assuring manufacturer’s specifications and alignments
-
Removed saddle and table from bed ways
-
Removed table from saddle
-
Way ground top of saddle ways, master and gib ways, and binder
-
Removed old turcite from bottom of table
-
Supplied and installed new material to bottom of table
-
Scraped master table and saddle, made table 4 corners 0 to top of table
-
Supplied and installed material to table gibs and binders
-
Scraped and fitted table gibs and binders to saddle
-
Supplied and installed material to bottom of saddle
-
Scraped master saddle to bed to keep square and parallel to bed ways
-
Supplied and installed material to saddle gibs and binders
-
Scraped and fitted saddle gibs and binders to bed
-
Aligned ball screw for table and saddle
-
The head was removed from column
-
The ways were cleaned and polished to best as condition
-
New turcite was installed on head
-
The head was scraped and precision aligned to column
-
The binders and gibs were refit
-
Turcite was installed as required
-
Gibs were scraped and fit, upon completion, gibs brought to full adjustment
-
Precision Service sent all ball screws out for inspection
-
Installed thrust bearings in all axis
-
Cleaned, inspected, repaired lubrication system in areas of repair; assuring proper oil flow to all required areas
-
Assembled and test ran machine
-
Set all proximity switches