MORI SEIKI ZL-45M
-
Dismantled machine
-
Cleaned all units
-
After cleaning all components and structural castings, carefully inspect for overall condition
-
Machine, scraped and fitted all quoted way surfaces to full bearing, assuring longer life of all necessary component
-
Surveyed headstock; adjust bearing to manufacturer’s specifications
-
Way ground bed ways upper and lower
-
Ground clamping areas of bed
-
Scraped and precision aligned fixed headstock to bed ways
-
Scraped saddles to bed, keeping square to fixed spindle
-
Way ground top of X axis ways, both slides
-
Scraped, flaked and mastered bottom ways of cross slide to saddles
-
Scraped, flaked and fit X¹, X² and Z¹, Z² axes gibs